The Future

  • $18.5 million capital project to be completed in fall 2019
  • Integrated sports and fitness center that will be unique in SWFL
  • Extended Driving Range and enhanced practice facilities
  • 11 Har-Tru Tennis Courts
  • 4 Pickleball Courts, 3 Bocce Courts and 1 Croquet Court
  • Expanded casual dining kitchen
  • New wine room/private dining room
  • New Halfway House and Cart Barn
  • Updated Clubhouse interiors
  • Revamped Clubhouse entrance, entrance roads and parking lots

Project Timeline

Summer 2018  

Detailed submission of the costing of the project by contractors/ subcontractors.

Conclude negotiations with potential lenders.

A construction loan may be used during the construction period after which the construction loan would be converted into a long-term mortgage.

The design, engineering and permit process will begin, with a target of construction starting in mid-fall 2018.

Start conversion of the current Golf Pro Shop into a temporary area for fitness operations.

Secure temporary space for the Golf & Tennis Pro Shops.

Mid-Fall 2018 – Summer 2019

Demolish existing tennis and fitness buildings.

On that location, build an integrated sports and fitness center, with a Cart Barn and new entryway. (Retain the existing pool.)

Create space to extend the Driving Range and add cart parking by directing the creek into a pipe and then filling in the creek bed between the current Driving Range and tennis/fitness buildings.

Build 4 pickleball courts on one tennis court.

Spring 2019 – Fall 2019

Expand the Greenside Grille kitchen and commissary (food delivery, storage and prep).

Relocate Staff locker and break rooms.

Build a wine room that can also serve as a 24-40 seat private fine dining option when the Greenside Grille is open.

Relocate the lending library to a new meeting room.

Re-route the entry to the Men’s and Women’s Locker Rooms; bring bathrooms up to code.

Demolish the existing Cart Barn and Golf Pro Shop.

Build three bocce courts and one croquet court in that area.

Build a Halfway House near those courts to serve both golfers and bocce/croquet players.

Build a new roadway and entry to the Clubhouse; reconstruct the porte cochere at the main entrance.

Upgrade the loading dock to provide more space for truck unloading and add higher walls to shield this area from Member parking and the Clubhouse main entrance.

Update the Clubhouse interior and exterior.